Cases Euramax Cladding

Euramax Cladding: 25 years of custom work on InforLN, with a Wercstat framework layer since 2021

Since 2000, Wercstat has built custom modules on Euramax's InforLN ERP: a transport, quality and production module that are still in daily use after 25 years. Since 2021, a Wercstat ERP layer sits on top, with sales orders, material and production planning, inter-company orders and stock scanning. Fully integrated with InforLN and operating 24/7, because production also runs in night shifts.

Euramax Cladding: 25 years of custom work on InforLN, with a Wercstat framework layer since 2021
Sector
Aluminium cladding manufacturing
Period
Since 2000
Stack
InforLN, InforLN tools, Java, Wercstat framework

The challenge

Euramax Cladding runs its business processes on an InforLN ERP. Over the years, a need arose for extra functionality on a number of core processes, such as transport, quality and production, and for a modern, web-based layer on top for sales, planning and the shop floor. At every step the principle was the same: build onto the existing ERP, don’t replace it.

What we have built on InforLN since 2000

Using InforLN’s own tooling, we developed a series of modules that integrate tightly with the ERP:

  • Transport module: planning and registration of transport around production and delivery.

  • Quality module: recording and following up quality checks within the production process.

  • Production module: support for Euramax’s specific production steps.

After twenty-five years, these modules are still in daily use.

A Wercstat framework layer on top, since 2021

From 2021, we built a Wercstat ERP layer on top, for processes that come into their own better in a modern, web-based environment:

  • Sales orders.

  • Material planning.

  • Production planning.

  • Inter-company orders.

  • Stock scanning on the shop floor.

The application is fully integrated with the existing InforLN ERP. Master data, stock and orders stay in one place; users work in the environment that best suits their role, without data being recorded twice.

In production 24/7

Euramax also produces in night shifts, so the application runs 24/7. Availability and stability are therefore non-negotiable: any interruption directly affects the production floor.

Partnership

Euramax shows how long a well-chosen architecture can last. The original InforLN modules have been running for a quarter of a century; the new Wercstat framework layer adds modern functionality without the ERP beneath it having to give way. Throughout, Wercstat is the ongoing technical partner: from the first InforLN custom work in 2000 to today’s 24/7 production support.

A similar challenge in your organisation? Get in touch for a conversation.

← Back to cases